Building conversion, general construction
refurbishment
Scope of works::
- construction during the normal operation of the hospital
- reinforced concrete main stucture, brick walls
- Overall arcitectural and M&E works
- Air handling units and BMS
- Fire alarm
- on-site, off-site public utilities, road construction
Effective area of the facility: cca. 6.000 sqm
Period of construction: September 2005 - April 2007