Building conversion, General construction
Construction of the emergency building including the medical technology
Scope of works:
- Reinforced concrete main stucture, brick walls
- Overall arcitectural and M&E works
- Air handling centre and BMS
- Fire alarm
- Furniture
- Helicopter landing on the roof
- On-site, off-site public utilities, road construction
- Overall medical technology installation
Period of construction: 2005. szeptember 12 - 2007. április 30.
Effective area of the facility: 6.000 sqm