|
|
FERTŐDI ÉPÍTŐ ÉS SZOLGÁLTATÓ ZRT. • 9400 SOPRON, IPAR KRT. 13. |
|
|
|
|
|
|
|
|
Sopron, Swedwood – industrial facility (furniture board factory) |
|
Sopron, General Construction
Scope of works:
- pre-fabricated reinforced concrete load bearing structure
- 840 ton sawdust storage (silo)
- Overall M&E and architectural finishing works
- spinkler system
- Overall public utility system, road construction and landscaping
- 1000 sqm waste storage
- 2000 sqm storage extension
Effective area: 23.142 sqm
Period of construction: 12th October 2007 – 17th November 2008
|
|
|
|
|
|
|